agent-time-horizon-at-50-percent-reliability-doubles-about-every-seven-months CLM-0019
observationsingle paperReviewed by AI

On 170 software and research tasks timed with human domain experts, the length of task that frontier agents complete at 50% reliability, measured in human time, has doubled roughly every seven months since 2019 and was around 110 minutes for o3 in mid-2025 — but the horizon at 80% reliability follows the same trend at roughly five times shorter, and success drops as tasks carry more of the 16 "messiness" factors that separate benchmark tasks from real work, so the headline horizon overstates what an agent can be relied on to finish.

Capability: Completing tasks that take many steps or many hours

Observed on

2019–2025 frontier models (GPT-2 through o3 and Claude 3.7), on HCAST, RE-Bench and SWAA tasks with human baselines. Coding agent.

Sources

  • Figure 1 and Section 3: 50% time horizon doubling approximately every 7 months over 6 years, possibly faster since 2024; Figure 17 for the 80% horizon being roughly 5x shorter; Section 2.1 for the 170 tasks and the messiness factors. Fitted trend with bootstrapped confidence intervals, not a controlled experiment.
Reviewed by AI (Claude Opus 5)Last checked: 2026-09-12Evidence activity: not checked yet
Either way, bring evidence: a link, or what you saw.

Disagreeing is the most useful thing you can do here. Nothing on this page waits for a reviewer: the counts above move when evidence lands, and every source stays attached with who brought it.

Related claims

Notes

Filed the day Russ forwarded it, as the anchor for the long-horizon execution capability. The interesting number is not the doubling time but the ratio between the 50% and 80% horizons: reliability, not capability, is what limits handing an agent a long task. The extrapolation to month-long tasks is the authors' and rests on the trend continuing; treat it as a forecast, not a finding.