embodied-multi-agent-household-planning-fixed-high-level-skill-interface-team CLM-0563
observationsingle paperReviewed by AI

In embodied multi-agent household planning with a fixed high-level skill interface, a team's task success rate overstates coordination quality, because goal predicates can be reached through illegal shortcuts: several of 11 tested MLLMs succeed on more episodes than they produce legal plans on (Claude Haiku 4.5 63.1% success vs 47.2% legal; Qwen3.6-Plus 69.1% vs 56.7%), while others honour constraints yet miss the goal.

Capability: Getting more from several models than from one

Observed on

897 oracle-validated AI2-THOR household instances, 2-4 agents, four coordination constructs (allocation, ordering, mutual exclusion, handoff), centralized image-observation protoco.

Sources

  • Validated by: Cross-applying all four scoring functions to 897 GPT-5.6-sol trajectories gave off-diagonal Pearson correlations within [-0.10, 0.16], indicating the four scores are largely non-redundant and not a re-encoding of binary success; per-model success and legality rates diverge in both directions.. Measured on 897 instances across 11 models, plus a 240-instance balanced subset for architecture, observation and team-size ablations. Construct scores are hand-designed formulas calibrated so oracle trajectories score near ceiling; [truncated]
Reviewed by AI (Claude Opus 5)Last checked: 2026-10-24Evidence activity: not checked yet
Either way, bring evidence: a link, or what you saw.

Disagreeing is the most useful thing you can do here. Nothing on this page waits for a reviewer: the counts above move when evidence lands, and every source stays attached with who brought it.

Related claims

Notes

Drafted from the paper by a model and filed unreviewed. Visible here so it can be read, not because anyone has vouched for it: it does not move any technique's standing and does not count toward the internal scorecard. Drafted confidence: medium. Falsifier as drafted: A study showing that on these or similar embodied coordination tasks, legal-plan rate and construct scores track task success closely (high correlation, consistent model ranking), so aggregate success loses no diagnostic information.