arxiv-2503-14499 SRC-0078 · paper

Measuring AI Ability to Complete Long Software Tasks

Thomas Kwa, Ben West, Joel Becker, Amy Deng, Katharyn Garcia, Max Hasin, Sami Jawhar, Megan Kinniment, Nate Rush, Sydney Von Arx, Ryan Bloom, Thomas Broadley, Haoxing Du, Brian Goodrich, Nikola Jurkovic, Luke Harold Miles, Seraphina Nix, Tao Lin, Chris Painter, Neev Parikh, David Rein, Lucas Jun Koba Sato, Hjalmar Wijk, Daniel M. Ziegler, Elizabeth Barnes, Lawrence Chan

Created: 2025-03-18 · Ingested: 2026-09-12

https://arxiv.org/abs/2503.14499(opens in a new tab)

Despite rapid progress on AI benchmarks, the real-world meaning of benchmark performance remains unclear. To quantify the capabilities of AI systems in terms of human capabilities, we propose a new metric: 50%-task-completion time horizon. This is the time humans typically take to complete tasks that AI models can complete with 50% success rate. We first timed humans with relevant domain expertise on a combination of RE-Bench, HCAST, and 66 novel shorter tasks. On these tasks, current frontier AI models such as Claude 3.7 Sonnet have a 50% time horizon of around 50 minutes. Furthermore, frontier AI time horizon has been doubling approximately every seven months since 2019, though the trend may have accelerated in 2024. The increase in AI models' time horizons seems to be primarily driven by greater reliability and ability to adapt to mistakes, combined with better logical reasoning a…

In brief

The length of software task an AI agent can finish at 50% reliability has doubled roughly every 7 months since 2019, giving a single scale on which GPT-2 and o3 can be compared. METR timed skilled human baseliners on 170 tasks spanning 1 second to 30 hours, combining HCAST (97 tasks), RE-Bench (7 eight-hour ML research tasks), and 66 new single-step Software Atomic Actions, then ran 12 frontier models with 8 attempts per agent/task pair and fit a logistic curve to recover the 50% success duration.

GPT-2 sits at 2 seconds, o3 at about 110 minutes, with a doubling time of 207 days (95% CI 166-240 days). The 80% time horizon follows a similar slope (204 days) but sits 4-6x shorter, so moderate-length tasks are not reliably completed. o3 lies above the long-run line (p = 0.006).

Errors come from a 3-level hierarchical bootstrap over families, tasks and runs, plus sensitivity checks over weighting and regularization; the slope is better identified than any single model's horizon. Replication on SWE-bench Verified holds the exponential but at ~70 days, which the authors attribute to annotator time estimates.

Scope: software and ML research only, automatically scored tasks, and performance drops on higher-"messiness" tasks. Internal PR tests show contractors take 5-18x longer than maintainers, so horizon depends heavily on which humans you compare against.

Treat time horizon as a comparable capability axis, but not yet as a real-world job-automation forecast.

Written from the abstract by claude-opus-5 on 2026-09-13, with every figure checked against it. Not a substitute for the paper.

Referenced by

Claims in this catalog that draw on this source, and whether as support or counterpoint.